SUNY Alfred State MacKenzie Complex

SUNY Alfred State MacKenzie Complex

Location

10 Upper College Drive, Alfred, NY

Owner

Dormitory Authority of the State of New York

Architect

Mach Architecture

Cost

$18,000,000

Start Date

04.01.2018

Completion Date

09.01.2020

Savarino Companies is currently serving as General Contractor for the second phase of renovations to the MacKenzie Complex, SUNY Alfred State’s largest residence hall which houses approximately 1,100 students. The phase two renovation project includes the renovation of the south and east wings, constructed to LEED-Silver standards.

LEED elements include installing a tankless water heating system, which provides an endless supply of hot water while saving space and reducing energy costs, a new high-efficient heating system, energy-saving LED lighting in the hallways and student rooms, equipping bathrooms with water-efficient plumbing fixtures to reduce indoor water usage, and an upgraded ventilation system that uses energy recovery technology. In addition, all power, lighting, and alarm systems will be renovated. Mechanical and plumbing systems will be reconstructed and a fire protection system will be installed throughout the entire building. Student rooms will receive new paint and upgraded carpet throughout the interior. Exterior renovations include roof and window replacement and the construction of new entrance foyers. New sidewalks and landscaping will be completed for both buildings, encouraging student wellness and outside activities.

 

Alfred university graffiti wall

Alfred University Harder Hall

Location

10 Upper College Drive, Alfred, NY

Owner

State University Construction Fund

Architect

Popli Design Group

Cost

$6,400,000

Start Date

04.01.2019

Completion Date

01.01.2021

Savarino Companies is currently serving as General Contractor for the Harder Hall HVAC Upgrades project for the SUNY College of Ceramics at Alfred, consisting of the replacement and/or re-calibration of existing air handling equipment, ductwork, and controls; Replacement of woodworking dust collection systems; Installation of two paint spray booths; Replacement of electrical panels; Construction of new structural platform supports to accommodate new equipment; Repair fire rating of mechanical spaces; And abatement of hazardous materials disturbed by the project.

alfred state hinkle memorial library

SUNY Alfred State Hinkle Memorial Library

Owner

State University Construction Fund

Architect

Bell & Spina, Architects-Planners, PC

Cost

$3,360,000

Start Date

05.01.2019

Completion Date

04.01.2020

Savarino Companies is currently serving as General Contractor for the renovations to SUNY Alfred State Hinkle Memorial Library. Main features of the work include abatement of hazardous materials disturbed by the project; Removal and replacement of curtain wall systems, storefront entry systems and exterior metal wall panels; Complete removal and replacement of roofing systems and enhancement of structural framing at roof perimeter overhangs, and the construction of lightning protection system.

brockport allen hall

SUNY Brockport Allen Administration Building

Location

Brockport, NY

Owner

State University Construction Fund

Architect

Flynn Battaglia Architects

Cost

$6,300,000

Start Date

06.01.2018

Completion Date

07.01.2020

Savarino Companies is currently serving as General Contractor for the renovations to SUNY Brockport Allen Administration Building, which remains occupied during the entire construction phase.

Work includes asbestos abatement and demolition of windows, ceilings, walls, flooring, and pipe insulation; Complete removal and replacement of existing roofing systems, and temporary relocation of rooftop telecommunication equipment; Exterior concrete and masonry repairs; Removal and replacement of storefront window systems and entrance canopies; And removal and replacement of perimeter mechanical piping and water pump systems.

 

houghton university

SUNY Fredonia Houghton Hall

Location

Fredonia, NY

Owner

State University Construction Fund

Architect

Mitchell Giurgola Architects LLP

Cost

$15,600,000

Start Date

05.01.2019

Completion Date

09.01.2020

Savarino Companies is currently serving as General Contractor for the interior fitout construction of the basement, first floor and second floor of SUNY Fredonia Houghton Hall, complete with new teaching laboratories, research laboratories, student lounges, conference rooms, offices and support spaces.

The project’s environmental goals include achieving LEED 2009 New Construction Silver rating and other significant components of the work include full removal and replacement of the existing roofing system down to structure, including wood blocking, hatches, skylights, sealants and drains; Renovation of a hydraulic elevator; And site demolition, new utility connections, new paving and landscaping.

 

fredonia rockefeller hall

SUNY Fredonia Rockefeller Arts Center

Location

Fredonia, NY

Owner

State University Construction Fund

Architect

Bell & Spina, Architects-Planners, PC

Cost

$1,300,000

Start Date

04.01.2019

Completion Date

12.01.2019

Savarino Companies is currently serving as General Contractor for the window replacement capital project at SUNY Fredonia Rockefeller Arts Center. The main features of this project include the removal and replacement of existing aluminum windows and exterior doors, replacement of existing roof vents with new pyramid skylights, repair of the concrete facade at various locations and the abatement of hazardous materials disturbed by window, door and skylight replacement.

canalside longshed

Canalside Longshed

Location

Canalside, Buffalo, NY

Owner

Erie Canal Harbor Development Corporation

Architect

HHL Architects

Cost

$5,000,000

Start Date

04.01.2019

Completion Date

07.01.2020

Savarino Companies is currently serving as General Contractor for the new construction of an interpretive structure along Erie Canal’s historic Commercial Slip at Canalside. The Longshed will be a 2-story, 5,000 sq. ft. heavy timber structure with vertical and horizontal wood siding designed to provide homage to the former canal loading and unloading buildings that historically lined the Erie Canal in Buffalo.

The Buffalo Maritime Center will be the first occupant of the Longshed and will build a replica canal packet boat. After that, the building will serve a variety of public uses year round.

hope house in buffalo ny

Hope House

Location

243 Sears Street, Buffalo, NY

Owner

Lt. Col. Matt Urban Human Services Center of WNY

Architect

Flynn Battaglia Architects, PC

Cost

$7,550,000

Start Date

06.01.2018

Completion Date

11.01.2019

Savarino Companies is currently serving as General Contractor for the historic rehabilitation and adaptive reuse of former Buffalo Public School #57 into 27 units of affordable housing and offices for the Lt. Col. Matt Urban Human Services Center of WNY.

Child Advocacy Center at BestSelf

Child Advocacy Center at BestSelf

Location

768 Delaware Avenue, Buffalo, NY

Owner

BestSelf Behavioral Health

Architect

CJS Architects

Cost

$15,000,000

Savarino Companies is currently serving as Program Manager for the relocation and expansion of the Child Advocacy Center in Buffalo, NY. The 50,000 sq. ft. project also includes the creation of a new family outpatient mental health clinic and new offices for BestSelf’s executive and senior management teams. The project is currently in the design phase.

Rosanna Elizabeth Visual and Performing Arts Center

Rosanna Elizabeth Visual and Performing Arts Center

Location

467 Richmond Avenue, Buffalo, NY

Owner

467 Richmond Avenue, LLC

Architect

Watts Architecture and Engineering

Cost

$10,600,000

Start Date

06.01.2018

Completion Date

09.01.2020

Savarino Companies provided Development Services and is currently serving as Construction Manager at Risk for the historic rehabilitation and adaptive reuse of the former Richmond Methodist Episcopal Church on Buffalo’s West Side into a mixed-use complex featuring a performing arts center, art gallery and studio apartment.